Egat to install new generator as private supplies stall

"The investment is necessary, since two independent power producers cannot start operating their plants and supply electricity as planned," Egat governor Sutas Patamasiriwat said yesterday.

The second generator should start up in 2014 or 2015, when the country's power reserve is expected to fall to 9 per cent of installed capacity. The normal ratio is 15 per cent.

The two IPPs are Siam Energy, which has to relocate its 1.6gigawatt Bang Khla plant from Chachoengsao to Ayutthaya because of local resistance, and National Power Supply, which also faces local pressure to move its 600megawatt plant out of the same province.

An energy gap could emerge if economic growth goes beyond 4 per cent per year, Sutas said.

The new 800MW generator is part of Egat's plan to reduce supply risks, coupled with delaying the decommissioning of the Bang Pakong and Wang Noi plants and the construction of? two Bt20billion plants in Chana and Wang Noi with combined capacity of 1.6GW.

Altogether, this will increase the reserve from 9 per cent to 10 per cent, he said.

The second generator would be inside the existing facility at Bang Kruay in Nonthaburi, so this should not give rise to environmental concerns. Standard environmental measures will be taken and the piped naturalgas supply is sufficient to feed the new generator.

Yesterday, Egat held a commissioning ceremony for the first generator at the North Bangkok Power Plant, with Energy Minister Wannarat Charnnukul presiding.

The Bt17.4billion unit replaces the old generator decommissioned in 2005 under the Power Development Plan 200413. The combinedcycle plant has capacity of 704MW.

Wannarat believes that the operation will not have any adverse impact on the surrounding communities, as it is constructed according to an environmentalprotection plan, with constant monitoring of air quality within 5 kilometres of the site.

Wednesday, September 29, 2010

#131 - Generator HHO run time tests, Part 1 of 4

For latest news please visit my web site http://www.alt-nrg.org/ In this mini-series I attempt to answer the age old question posed by our critics "Are we on the right track or just spinning our wheels?" For this test I am using a gasoline powered AC generator. This is the ideal platform to test with because it's carbeureted. No fuel injection ECU, O2, MAF, etc to deal with. No EFIE required. ========================================-========= I have collected the data. You be the judge.


Watch Youtube About Generators

Silent Diesel Generator

Newer 2010 model now available at www.EmergencyPower.com | Remote Start Sile...

Newer 2010 model now available at www.EmergencyPower.com |
Remote Start Silent Diesel Generator 6500 Watt - Aurora makes the highest quality available anyplace.


Watch Youtube About Generators

Tuesday, September 28, 2010

Bad Religion- Generator

Bad Religion-Generator

lyrics Like a rock,
Like a planet,
Like a fucking atom bomb,
I'll remain unperturbed by the joy and the madness
That i encounter everywhere I turn
I've seen it all along
In book and magazines
Like a twitch before dying
Like a pornographic sea
There's a flower behind the window
There's an ugly laughing man
Like a hummingbird in silence
Like the blood on the door
It's the generator
Oh yeah, oh yeah, like the blood on my door
Wash me clean and I will run
Until i reach the shore
I've known it all along
Like the bone under my skin
Like actors in a photograph
Like paper in the wind
There's a hammer by the window
There's a knife on the floor
Like turbines in darkness
Like the blood on my door
It's the generator

Disclaimer: This song does not belong to me, it is copyright to the band Bad Religion and has nothing to do with me.


Watch Youtube About Generators